SENIOR PROJECT MANAGER – DATA CENTRE CONSTRUCTION (JB/KL) [Job Code 2403108A]

Responsibilities:

  • Manage project execution for green and/or brown field projects
  • Lead project team including engineers and contractors
  • Oversee day to day construction oversight to ensure the project is carried out per project specifications and EHS requirement, and is on schedule and cost efficient per approved budget.
  • Provide timely and accurate reporting of project progress and expenditure to management
  • Ensure Environment, Safety and Occupational Health implementation on site
  • Troubleshoot issues during design & construction phase
  • Ensure that content of all submission is aligned to Company & client’s requirement
  • Evaluate on-site installation quality & rectify problems
  • Participate in site testing and commissioning process
  • Serve as a lead to provide advice & guidance during handover
  • Maintain tracker sheet on defects & assign manpower for defect clearance

Requirements:

  • Degree/Diploma with at least 7 years’ experience in project / engineering / construction management. Experience in green and/or brown field data centre projects preferred.
  • Ability in reading design and construction drawings for all fields (Architectural, Structural, M&E, etc.)
  • Knowledgeable in various M&E critical systems (e.g. UPS, Generator, Chiller, Cooling Tower) requirement including testing and commissioning (i.e. FAT, SAT, IST)
  • Positive proactive attitude and ethical behaviour.
  • Experience in Microsoft Office i.e. Microsoft Word, Excel and PowerPoint.
  • Knowledge in project management tools, solutions, and techniques highly desirable.
  • Familiarity with Authority Requirement and Code of Practice preferred
  • Excellent interpersonal, communication and people management skills.
  • Good leadership and team player with ability to work independently and resolve challenges in a fast-paced environment.
  • Excellent interpersonal, communication and collaborative skills.

EA Licence No: 22C1055

EA Personnel Registration No: R2095104